A 450-location rollout delivered in the first ten days of a shutdown

Two product lines, 450 locations, three provinces — including the training content.

SectorFinancial services — distribution
Period2020
RoleSenior Operational Efficiency Advisor
450locations kept trading
3provinces
10 daysfrom shutdown to live

Context

When the Covid-19 shutdown closed branches, two independent financial product lines had no way for clients to complete agreements. The alternative was losing the business.

Intervention

Led a transversal project team to implement an eSignature solution, including the automated compliance and operational processes, the IT solution, and the training content the network needed to adopt it.

Outcome

  • 450 retail distribution locations in Alberta, Ontario and New Brunswick kept trading.
  • Compliance was automated rather than manually assured under time pressure.
  • Delivered inside ten days of the shutdown beginning.

Why it matters

Most change fails at adoption, not at build. Shipping the IT solution and the training together is what made the timeline possible.